FOUNDATIONS FOR TRANSMISSION LINES

380 kV Salzburgleitung foundation building (Austria)


Construction of foundations for the new 380kV transmission line Salzburgleitung, in the Salzburg region and Upper Austria.


foundations-for-transmission-line-salzburgleitung-_0007_5
PHASE 1

Inspection and drilling

Construction of foundations for the new 380kV transmission line Salzburgleitung, in the Salzburg region and Upper Austria.
Tower spots in steep terrain with significant slope inclination which required different types of slope stabilization measures. Excavation and drilling by means of Spider excavators and special drilling units mounted on the spider excavator.


PHASE 2

Block or Pile

4 concrete foundations pads and chimney each tower, diameter from 1000 mm to 1300 mm.
Depending on the ground conditions concrete block foundations or pile foundations (micropiling) were designed. The concrete block foundations are made with reinforced slabs and round chimney.

foundations-for-transmission-line-salzburgleitung-_0001_11

foundations-for-transmission-line-salzburgleitung-13b
PHASE 3

Pile foundation

Deep foundations are small diameter piles (micropiles), borehole of at least DM 150mm for the depth level from 0 to 15 m.
Execution of a pile foundation test was required from the Client. The Pile Foundations are integrated into reinforced pile pads with reinforced round chimney.


PHASE 4

Transports and tools

The transport of materials in many cases was made possible by means of helicopters and ropeways for material transport. Consolidation of excavations with steep slopes using soil nailing technology. Performed with special machines mounted on spider excavator and transportable by helicopter.

foundations-for-transmission-line-salzburgleitung-_0006_6

parallax background

FINAL PART

The final stages involved the construction of access roads. Creation of gravel and geotextile roads and mobile access roads by means of wood or metal planks.



GALLERY


SPECS

The deadline for our foundation works was December 2022: all construction works were completed on time.


 Fundament Bygging
COUNTRYAustria (EU)
CLIENTAPG Austrian Power Grid
MAIN CONTRACTOR
  • ARGE ELE-FER Powerlines (Elettrodotti Cantamessa & Co. S.p.A)

  • REBAIOLI SPA
SUB CONTRACTORIMPRESA DUCI SRL

Contract duration

2020-2022

Value

5.500.000,00 €

Country

Austria

Salzburgleitung